Preventive plans
Rotary 1 and general equipment
Sample data
FrançaisCompliance this month
87 %
26 of 30 within the window
Due this week
9
of which 3 by cycle count
Overdue
2
Emergency stop and earth check
Planned downtime windows
2
this week, 4 h 30 min
Week of 22 to 28 November
Saturday 22 · today
Hose change · station 15
In progress
Scale check · all shifts
Done
Sunday 23
Conveyor check
Due
Monday 24
Tuesday 25
Valve check · group A
Window 14:00
Earth resistance check
Due
Emergency stop test
Overdue
Wednesday 26
Thursday 27
Hose change, stations 1 to 8
Due
Gas detector calibration
Due
Friday 28
Holiday
Plans
| Task | Applies to | Trigger | Interval | Progress | Next due | 90-day compliance |
|---|---|---|---|---|---|---|
| Scale check with reference weight | All stations · 24 | Shift | Every shift | — | Next shift | 98 % |
| Valve check and cleaning | Rotary 1 valves | Cycles | 100,000 | Highest station 96 % | Tuesday 25 | 92 % |
| Hose change | Rotary 1 hoses | Cycles | 250,000 | 92 % | Thursday 27 | 100 % |
| Clamp and clamp sensor check | Rotary 1 clamps | Calendar | 30 days | 40 % | 10 December | 100 % |
| Earth resistance check | Earthing grid | Calendar | 90 days | 97 % | Tuesday 25 | 100 % |
| Gas detector calibration | Gas detectors · 6 | Calendar | 180 days | 99 % | Thursday 27 | 100 % |
| Emergency stop test | Rotary 1 | Calendar | 30 days | 3 days overdue | Was due 19 November | 67 % |
| Conveyor check | Infeed conveyor | Running hours | 500 h | 88 % | Sunday 23 | 100 % |
| Power supply outputs check | Ex power supply | Calendar | No interval · set it | — | — | — |
The intervals above are examples. The system sets no default intervals, because manufacturers do not publish them: the plant sets them at installation. The scale check every shift is the only exception.
Planned downtime windows
Saturday 22 · 08:00 to 11:00Station 15 · hose changeRunning · planned stop
Tuesday 25 · 14:00 to 15:30All of rotary 1 · valve check and emergency stop testPlanned
Downtime inside the window does not count against availability. Anything past its end counts as unplanned downtime.