Preventive plans

Rotary 1 and general equipment
Sample data
Français
Compliance this month
87 %
26 of 30 within the window
Due this week
9
of which 3 by cycle count
Overdue
2
Emergency stop and earth check
Planned downtime windows
2
this week, 4 h 30 min

Week of 22 to 28 November

Saturday 22 · today
Hose change · station 15
In progress
Scale check · all shifts
Done
Sunday 23
Conveyor check
Due
Monday 24
Tuesday 25
Valve check · group A
Window 14:00
Earth resistance check
Due
Emergency stop test
Overdue
Wednesday 26
Thursday 27
Hose change, stations 1 to 8
Due
Gas detector calibration
Due
Friday 28
Holiday

Plans

TaskApplies toTriggerIntervalProgressNext due90-day compliance
Scale check with reference weightAll stations · 24ShiftEvery shift—Next shift98 %
Valve check and cleaningRotary 1 valvesCycles100,000
Highest station 96 %
Tuesday 2592 %
Hose changeRotary 1 hosesCycles250,000
92 %
Thursday 27100 %
Clamp and clamp sensor checkRotary 1 clampsCalendar30 days
40 %
10 December100 %
Earth resistance checkEarthing gridCalendar90 days
97 %
Tuesday 25100 %
Gas detector calibrationGas detectors · 6Calendar180 days
99 %
Thursday 27100 %
Emergency stop testRotary 1Calendar30 days
3 days overdue
Was due 19 November67 %
Conveyor checkInfeed conveyorRunning hours500 h
88 %
Sunday 23100 %
Power supply outputs checkEx power supplyCalendarNo interval · set it———
The intervals above are examples. The system sets no default intervals, because manufacturers do not publish them: the plant sets them at installation. The scale check every shift is the only exception.

Planned downtime windows

Saturday 22 · 08:00 to 11:00Station 15 · hose changeRunning · planned stop
Tuesday 25 · 14:00 to 15:30All of rotary 1 · valve check and emergency stop testPlanned
Downtime inside the window does not count against availability. Anything past its end counts as unplanned downtime.