Maintenance board
Saturday 22 November · 10:40 · Carousel 1 and general equipment
Open orders
10
All states before closing
Urgent now
1
Leak at station 22 head
Overdue
2
Past the target time
Preventive compliance
87%
This month, 26 of 30
Mean repair time
38 min
This month, repair orders
Work orders
Carousel 1 and equipment
Requested2
P2 TodayRepairWO-2611-0144Repeated overweight, valve may not be closingStation 4Alert: overweight in 3 of the last 10 cycles · 25 min agoP3 PlannedInspectionWO-2611-0145Head sensor timeout 3 times this shiftStation 7Automatic rule · 12 min agoOpen3
P2 TodayCalibrationWO-2611-0141Scale check out of limit: +62 gStation 18Start-of-shift check 06:09 · [Technician 2]P3 PlannedPreventiveWO-2611-0136Valve inspection and cleaning, group AStations 1 to 8Planned Tuesday 25 November · 14:00P3 PlannedSafetyWO-2611-0130Earthing resistance testEarthing networkDue in 3 daysIn progress2
P1 UrgentRepairWO-2611-0139Leak at the filling headStation 22Operator report 07:48 · started 07:55 · station stoppedP3 PlannedPreventiveWO-2611-0128Hose replacementStation 15Inside the 08:00 to 11:00 window · [Technician 1]Alerts without a work order
Station 11Slow filling
The 7-day fill_ms median is 17% above the 30-day median. Check the hose and the valve.
Station 16Repeated dropouts
6 dropouts from the Gateway today. Check the cable and connector.
Check scaleStation 4 rejects
2.6% of station 4 cylinders were rejected this shift.
Due within 7 days
Hose replacementStations 1 to 8 · by cyclesThursday 27
Valve inspection and cleaningGroup A · by cyclesTuesday 25
Conveyor inspectionInfeed conveyor · by running hoursSunday 23
Gas detector calibration6 detectors · by calendarThursday 27
Emergency stop testCarousel 1 · by calendar3 days overdue
Stores and calibration
Clamp sealCL-400 of 6
Filling hoseHS-123 of 8
10 kg test weight certificateExpires in 21 days
Check scale legal verificationIn 26 days